Completed Works

Some of the works we remember from our projects since 1993

Categories
8
Works
51
Years
1993
01

EXISTING-CONDITIONS MAPPING - TOPOGRAPHIC (PLANKOTE) SURVEYS

9 works
EXISTING-CONDITIONS MAPPING - TOPOGRAPHIC (PLANKOTE) SURVEYS 21
EXISTING-CONDITIONS MAPPING - TOPOGRAPHIC (PLANKOTE) SURVEYS 1
EXISTING-CONDITIONS MAPPING - TOPOGRAPHIC (PLANKOTE) SURVEYS 2
01 / 21
  1. 01Topographic (plankote) surveys are under way to serve as base maps for various primary and secondary schools, health clinics and police station projects of the Istanbul Governorship (YİKOB)…
  2. 02Topographic survey of 650 decares and project setting-out for the Maltepe military barracks
  3. 03Topographic survey of 385 decares and project setting-out for the Hasdal minimum-security barracks
  4. 04Topographic survey and facade measured survey of the SELİMİYE military barracks.
  5. 05KONYA Mevlana Museum surroundings: topographic survey and project setting-out.
  6. 06Istanbul Golf Club, Ayazağa Maslak: topographic survey
  7. 07Beykoz Burunbahçe: topographic survey
  8. 08Survey measurements of the tomb and nazire areas of Şehzade Mehmet Mosque
  9. 09Yalova-Soğucak earthquake housing: topographic survey and infrastructure project implementation, road projects, stormwater and wastewater project implementation, and building terrace levels and setting-out works
02

MEASURED SURVEY (RÖLÖVE) AND MERGING WORKS

15 works
01 / 08
  1. 01DETAILED MEASURED SURVEY AND DRAWING OF GALATA PORT
  2. 02MEASURED SURVEY WORKS FOR THE PLANKOTE SECTION OF THE HAGIA SOPHIA GRAND MOSQUE.
  3. 03Measured survey and drawing of the Harem Quarters of Topkapı Palace
  4. 04Measured survey and topographic survey of 850 parcels in the Fatih Süleymaniye renewal area
  5. 05Measured survey of the Aziz Mahmud Hüdai Tomb (Tomb, Sheikh's Quarters kitchens, Hünkar Mahvili, Çilehane)
  6. 06Topographic survey and measured survey of the Pervaneli Pavilion in Üsküdar
  7. 07Topographic survey and measured survey of Balipaşa Mosque
  8. 08Facade measured survey of the Garanti Bank Eminönü Branch
  9. 09Measured survey and drawing of an old building in Beşiktaş
  10. 10Measured survey of an old building in Koşuyolu
  11. 11Metro City measured survey
  12. 12Detailed measured survey and drawing of the Unkapanı Caricature and Humor Museum
  13. 13Facade measured survey of Taksim Tarlabaşı Street
  14. 14Measured survey and drawing of an old building on Sarıyer Büyükdere Street
  15. 15Measured surveys of many structures in Turkey (Istanbul, Samsun, Edirne) and abroad (Northern Iraq, Azerbaijan)
03

CORRIDOR (LINEAR) MAPPING WORKS

10 works
01 / 02
  1. 01İSKİ ANATOLIAN SIDE 250 KM STREAM CORRIDOR TOPOGRAPHIC SURVEY
  2. 02TURKCELL (TELCOM) 200 KM FIBER CABLE AS-BUILT CORRIDOR MAPPING
  3. 031/200 scale, 200 km İGDAŞ AS-BUILT project
  4. 04A.P.K. stream rehabilitation works project
  5. 05Detail survey and drawings of natural gas lines in Kadıköy Center and Esenler
  6. 06İGDAŞ detail surveys of the Hacı Hüsrev area (7 km)
  7. 07İGDAŞ detail surveys, Arnavutköy – Gaziosmanpaşa (30 km)
  8. 08Existing-conditions map for the E-5 Tram Line Project (between Kadıköy and Kartal)
  9. 09Topographic survey of the Şehzade Mehmet Mosque soup kitchen (imarethane)
  10. 10Measurement and design of the Gaziosmanpaşa Municipality sidewalk works (18 KM)
04

INFRASTRUCTURE DESIGN AND TOPOGRAPHIC SURVEY WORKS

5 works
01 / 03
  1. 01Çamaşırcı Stream rehabilitation between Kadıköy and Bostancı, and stormwater and wastewater project and construction works (8 km)
  2. 02Land implementation works for the Tavukçu Stream renewal
  3. 03İSKİ drinking water projects (GIS) in various districts (Zeytinburnu, Kağıthane, Çağlayan, Kadıköy)
  4. 04İzmit Metropolitan Municipality Hereke infrastructure works (wastewater, stormwater, drinking water, road projects and land implementation)
  5. 05Preparation and implementation of Silivri drinking water GIS and As-built (250 KM) projects
05

CONSTRUCTION SITE SURVEY ENGINEERING SERVICES

7 works
01 / 04
  1. 01ŞİLE-KÖMÜRCÜ Solid Waste Sorting Site: survey engineering services
  2. 02Site measurements during the construction of the Doğuş-Gülermak Olympic Village tram and metro line viaduct
  3. 03Site measurements during the construction of the Ora Bayrampaşa entertainment center
  4. 04Surveying services and project implementation for the Kuleli Military High School Conference Hall
  5. 05Şekerpınar Center topographic survey and infrastructure (wastewater and stormwater) projects
  6. 06Bored pile setting-out at Beylerbeyi Pier
  7. 07Survey engineering services for the Üsküdar Bağlarbaşı underpass and landscaping site
06

DEFORMATION MEASUREMENT AND EVALUATION WORKS

3 works
01 / 04
  1. 01ZEYREK MOSQUE restoration: deformation monitoring and evaluation study
  2. 02Eyüpsultan Sheikh Murat Tomb: deformation measurement and monitoring study
  3. 03Maslak Beybi GIZ Plaza deformation measurements
07

ZONING IMPLEMENTATION

1 works
  1. 01TUZLA Mimar Sinan District zoning implementation (Article 18 implementation: existing-conditions mapping, owner identification and parcelling plans)
08

Excavation Surveys and Earthwork Quantity Calculations

1 works
01 / 03
  1. 01Excavation surveys and earthwork quantity calculations have been carried out in various districts and areas of Istanbul